Lets Get Started Crafting Your Dreams
At Aspiring Log Homes we do our up most to make the building process as easy an enjoyable for you as possible. From working with your local council to obtain the correct permits, to working with and arranging local contractors to get your house to turn key finish. Naturally, we what as much input from you as possible.
Stage 1
Firsty we discuss ideas the styles and type of log construction building that you want. One that will suit your needs, property and budget. You may already know the exact design that you want so can go stright to drawings. We can take care of the drawings and plans using our own designers or you can use your own if prefered.
Firsty we discuss ideas the styles and type of log construction building that you want. One that will suit your needs, property and budget. You may already know the exact design that you want so can go stright to drawings. We can take care of the drawings and plans using our own designers or you can use your own if prefered.
Stage 2
After we have got plans and signed contracts the next stage is construction of the log shell.
Here, we will put in an order for the logs from the forestry and get them delivered to site.
After we have got plans and signed contracts the next stage is construction of the log shell.
Here, we will put in an order for the logs from the forestry and get them delivered to site.
Stage 3
The logs are hand peeled to a wall paper finish. They are now ready to be used as a building material.
The logs are hand peeled to a wall paper finish. They are now ready to be used as a building material.
Stage 4
The wall logs are now stacked 1 on top of the other, each wall log is scribe fitted to the one below for an air tight fit. The notches will also be fitted with PEF rod foam and wool insulation to fill in the joinery voids. Also the window and door openings will be cut out at this stage and electrical holes and hurricane rods will also be drilled. This stage can take from 2- Months to 12- Months it all depends on design.
The wall logs are now stacked 1 on top of the other, each wall log is scribe fitted to the one below for an air tight fit. The notches will also be fitted with PEF rod foam and wool insulation to fill in the joinery voids. Also the window and door openings will be cut out at this stage and electrical holes and hurricane rods will also be drilled. This stage can take from 2- Months to 12- Months it all depends on design.
Stages 5, 6 and 7
The log shell is now completed and ready to be delivered to your property for re assembly. It will be taken apart like one big jigsaw puzzle and loaded onto a truck, or shipping container, depends where you live as we ship world wide.
Once the log shell arrives on site the Aspiring Log Home team will be there ready to meet it and re-assemble it for you on site. Average time frame is 1 day to 3 days for finished re-assembly of your log shell. The house in the photo took 2 days to re-assemble on site.
The log shell is now completed and ready to be delivered to your property for re assembly. It will be taken apart like one big jigsaw puzzle and loaded onto a truck, or shipping container, depends where you live as we ship world wide.
Once the log shell arrives on site the Aspiring Log Home team will be there ready to meet it and re-assemble it for you on site. Average time frame is 1 day to 3 days for finished re-assembly of your log shell. The house in the photo took 2 days to re-assemble on site.